How is the appropriate size of a solar PV installation determined?
The size of a solar PV installation depends on more than the number of photovoltaic modules that can fit on the roof. Electricity consumption and…
Read Guide
Solar PV systems generate electricity on residential and commercial buildings and on suitable land. Their usefulness depends on more than installed capacity: location, electricity demand and grid connection possibilities matter too.
How the site is used and its technical conditions determine which technology is suitable.
For each installation, we begin with the technical characteristics of the building or site and the customer's needs. We then prepare the technical design and documentation, and coordinate installation, grid connection and commissioning.
Build Your SolutionAvailable area is only one starting point. Orientation, shading, structural possibilities, the timing of electricity demand and how generated energy will be used are also important. These determine the layout, size and technical configuration of the PV installation.
Solar PV can operate alone or alongside battery storage, charging infrastructure and other energy devices. Integration options depend on installed equipment, the existing grid connection and usage patterns. For commercial systems, coordinated management of several devices with Flexgrid may also be useful.
The project covers an assessment of technical options, preparation of design and project documentation, required grid connection procedures, equipment supply, installation, electrical connections and commissioning. Inspections, servicing and maintenance are available afterwards.
The size of a solar PV installation depends on more than the number of photovoltaic modules that can fit on the roof. Electricity consumption and…
Read GuideIn addition to surface area, assess load-bearing capacity, roof covering, fixings, wind and snow loads, access routes, fire safety and electrical cable routes.
Read AnswerThe system adjusts its electricity export to stay within a specified limit at the grid connection point. Suitable metering and control are essential to its operation.
Read AnswerChoose the technologies and describe your requirements. At the end of the configurator, you can prepare an enquiry; direct contact remains available.