Charging electric vehicles is becoming part of businesses' everyday operations. Whether for company cars, a vehicle fleet or employee parking, charging infrastructure must support reliable vehicle use while respecting the grid connection capacity and other electricity demand on site.

Photograph of Charging Infrastructure from Supplied Materials · Publication Rights to Be Verified
Our Approach

Understanding the Site Before Selecting Equipment.

We assess vehicle numbers, parking duration and available connection capacity. Based on this, we design a suitable combination of AC and DC chargers and options for managing charging power. We also consider go-e and SolaX equipment where it meets project and site requirements. We manage the project from engineering through commissioning.

Build Your Solution
Charging Points Ready for Use.
Featured

Charging Points Ready for Use.

We consider available grid connection capacity, intended use and integration with the wider energy system.

Photograph of Charging Points from Source Materials.

AC and DC chargers to suit actual use

AC infrastructure is often appropriate for company passenger cars and longer parking periods. Where vehicles make several journeys and need to return to service quickly, DC charging may be suitable. The choice depends on actual use, not simply the charger's maximum rated power.

Multiple charging points on one connection

Simultaneous charging can substantially increase a building's electrical load. With suitable metering and controls, power can be shared among chargers and adjusted to other loads on site. This allows infrastructure to be planned within the actual technical limits.

Integration with solar PV and battery storage

Charging points can also become part of a company's wider energy system. We assess whether solar generation, battery storage and the operating patterns of other equipment should be considered. The exact functions depend on the chosen equipment and integration options.

Planning installation and future expansion

The initial design covers charger locations, cable routes, protection and distribution board capacity. At larger sites, we also consider later expansion to avoid unnecessarily reopening infrastructure when requirements change.

Related Reading

Technical Background to the Solution.

EV charging infrastructure and e-mobility · Osnove

When is an AC charger preferable to a DC charger, and vice versa?

The key factors are how long the vehicle can remain connected, the energy required, vehicle capabilities and the electrical power available on site.

Read Answer
EV charging infrastructure and e-mobility · Osnove

What is dynamic load management?

Charging power adjusts to other site loads and restrictions, provided the equipment supports the required metering and communication.

Read Answer
EV charging infrastructure and e-mobility · Osnove

What should be checked before installing multiple workplace chargers?

Total electricity demand, available connection capacity, cables, protection, routing, parking-bay layout and options for future expansion.

Read Answer

Build a Solution for Your Property.

Choose the technologies and describe your requirements. At the end of the configurator, you can prepare an enquiry; direct contact remains available.