Existing and new self-supply schemes: check the applicable rules first.
The same equipment can have different economics under different contracts.
Documents before calculations
Before upgrading, gather the connection consent, grid connection agreement, electricity supply contract and metering-point details. Do not infer the self-supply arrangement solely from the installation year. Verify which rules govern imports, exports and network charges.
An upgrade is more than a connection
Increasing capacity, replacing an inverter or adding storage may require additional checks with the relevant network operator. Obtain written clarification of the effect on existing conditions before ordering equipment. Retaining a favourable scheme is not an automatic guarantee from the installer.
Keep energy flows separate
Annual netting, interval-based netting and monetary valuation of surpluses lead to different outcomes. Simulations must use actual contractual terms, not generic assumptions about the value of every kilowatt-hour.
Document the decision
The proposal should state its assumptions and identify who will check any changes to the connection consent. As rules change, consult current documents and official guidance for the specific case.