How should workplace fleet charging be designed?
From the number of parking bays to rules that support daily operations.
Start with vehicle journeys
Gather information on daily driving, arrivals, departures and periods when vehicles are parked. A vehicle that has to leave early in the morning has different needs from one parked on site most of the day. Average mileage across the whole fleet can conceal these differences.
Energy by departure, not just maximum power
The aim is to supply the required energy on time. With several vehicles, charging schedules or power sharing can help. Rules should reflect operational priorities rather than simply splitting power equally among all connected vehicles.
Integration with the building
Charging points add to a company's existing electrical load. Solar PV and battery storage can influence the design, but their contribution must be assessed against the actual vehicle use pattern. Daytime and overnight charging have different starting points.
Agree the required functions
Define access, responsibilities, management and the data you need. If specific business functions are required, verify them for the actual solution and include them in the contract. Internet connectivity alone does not automatically provide those functions.

