One battery, several uses: how should availability be allocated?
Benefits from different functions should not simply be added together.
Competing objectives
Peak shaving, backup supply, self-consumption and market services may all require the same power or energy at the same time. A battery discharged for one task may be unable to perform another. Summing separate ideal scenarios therefore overstates the benefit.
Order of priorities
First define safety and operational limits, then contractual obligations and only then remaining optimisation. The EMS must know the minimum reserve, permitted power and equipment status. Users should understand who is authorised to change priorities.
An integrated simulation
Simulate all functions against the same time series. The calculation should account for efficiency, degradation, grid connection and availability. Show opportunities lost in one function because another takes priority as part of the trade-off.
Measuring the outcome
Reports should distinguish actually earned revenue, estimated avoided costs and operating costs. The baseline methodology must be known. Only then can the value of each function be assessed.