How does charging from surplus solar generation work?
To get rooftop electricity into a vehicle, metering and control must work together.
Surplus is not all generation
Other equipment in the building uses part of the solar output. Charging from surplus depends on what remains after those loads have been supplied. Accurate metering at the appropriate point is therefore essential.
Charging power adapts
A compatible system can adjust charging in line with available energy and configured limits. Vehicles and chargers have permitted operating ranges and increments, so adjustment is not unrestricted. Short-term weather changes require suitable control.
The user sets priorities
Surplus alone may not supply enough energy before departure. Decide whether maximising solar use or ensuring the vehicle is ready takes priority. Any battery and other flexible loads must also be considered.
Verify the entire connection
Selection requires information about the charger, metering, communications and control. The go-e Controller is one example of equipment that links metering with charging; final functionality depends on the selected configuration.

