Assess the building's needs before sizing its heating system.
Upgrading the building envelope can change the appropriate system capacity.
Start with heat losses
Heating demand depends on the building envelope, ventilation, indoor temperatures and use. Floor area is only an initial indicator. An energy assessment helps identify the largest losses and complementary measures.
Sequence investments carefully
If major insulation improvements follow a heating system replacement, the equipment chosen first may become oversized. Plan for the intended future condition of the building and a sensible sequence. Consider work that is cheaper to carry out together.
Moisture and air
Better airtightness changes ventilation requirements. Insulation and window replacement should therefore be considered together with air quality and humidity. Poorly designed junctions can leave thermal bridges and condensation problems.
Calculate and verify
Before work begins, estimate heat demand for different parts of the building. Afterwards, compare consumption while accounting for weather and occupancy. A lower bill alone does not prove technical savings if prices also changed.

